Timeline
CHART projects are implementing the Roadmap document 2025-2032. Find below the collapsable timelines of approved projects.
Project timeline
Institute
Status
of 29 projects
20192020202120222023202420252026202720282029
FCC / LHC-Lumi2020 – 2024
VdM: analysis and bias correction startegy
Beam-beam bias corrections in operational scans
Data analysis RUN3
RUN3 test analysis
Final Reporting
FCC Geodesy2021 – 2025
Surface geodetic reference network
Initial gravity fieldmodel for the FCC region
Calibration, test facility of the equipment
Gravity field models
Integration of a 3D gravity field model
Dynamic gravity field model
FCC Geodesy 22025 – 2026
Surface kinematics in the FCC region: literature review and legacy data reprocessing
Concept for future geodetic monitoring of the FCC region
FCC Geology 22023 – 2025
FCC-ee Injector linacs and sources (TDR)2025 – 2029
Reviewed baseline ready
Reference Design Report
Funtional specifications for TDR
First positron experiment
P-cubed report
Electron soource, top up demostrated
RF pulse compressor ready
RF structure ready
High-power test results
Industrialization process for RF strcutures production
FCC-ee SPIN-POL2022 – 2026
Code and theory benchmark
Preliminary FCC-ee simulations
Integration to the Software Framework
Extensive simulation campaign for FCC-ee cases
Propose operational scenarios for energy calibration measurements
FCCee Beam Dynamics2020 – 2025
Codes Review and FW strategy
1st FW with basic modules
Integration of Optics + BB modules + multi-IP studies
Simulation campaign for FCC-ee design
Reporting: FCC-ee CDR++
FCCee Beam Dynamics 22025 – 2029
Modelling and sensitivity studies
Simulation campaignes and performance studies
Tollerances definition and correction schemes proposal
Reporting on feasibility: beam-beam, e-cloud photoelectrons impact, coupling, ERL based collider
FCCee CPES2022 – 2024
Component prequalification
Top. Eval.
Prerliminary Demonstrator
Final Demonstrator
FCCee HTS42022 – 2026
Conceptual Design CCT Subscale
Manufa- cturingBeam-Dynamics and Radiation Management
Reports, Drawings
Design Integration with FCCee Feasibility Study, Prototype Module
FCCee Injector2020 – 2025
Physics design positron source and capture system ready
RF module designand costs
Report for the mid-term review
Installation P_Cubed
Report on the positron source P_Cubed experiment
FCCee Lumi2022 – 2026
Complete Collider Beam Optics
Lifetime Optimisation
Final FocusSensitivity Analysis
IP Tuning Knobs & Lumnosity Related Signals
Realistic Simulations of IP Tuning Process
Report on the Tuning Scheme & Performance
Luminosity tuning model, b-b instabilities, tolerances on IP aberrations
Report
FCChh Stability2020 – 2025
Develop FCC-hh Synchrotron radiation effects and coupling to collimation tracking tools
Integration of FCC-hh design software
Benchmark to LHC RUN3 data and Reporting
Reporting: FCC-ee CRD++
E-cloud studies for baseline and alternative scenarious (5ns micro-trains)
HTS Bulk Undulator2019 – 2026
Signature contract LSSwith Fermilab
End short sample program - Cambridge
Delivery of the LSS to PSI and Final assembly of the HTSI @ PSI
1st cold test of the HTSU(LSS+HTSI)
End of hardware comissioning
Extension
MagAM2020 – 2024
Experimental Investigation in Adhesive Joints
Digital Workflow Concept
Digital Workflow V1
Simulation Driven Optimization of Adhesive Joints
Adaptive Enspacers
Final Report
MagComp2022 – 2024
Preparation of 10-stack Nb3Sn Rutherford cables
Characterisation of the finite anisotropic mechanical behaviour of these 10-stacks
Modelling finite anisotropic mechanical behaviour
Project documentation, protocols and software implementation
MagDev12020 – 2023
Laboratory building finished
Decision of the technology demonstrator
Design and ConstructionBigBOX Demo
ConceptualDesignSubscale Mag.
Reports, Final Acceptance
MagDev22023 – 2025
LTS Sub SMCC conceptual design
LTS Sub SMCC construction; RebCO cable R&D for hybrid sub SMCC
SMACC and HTS SMCCconceptual design;ESC subSMCC test
SMACC eng design;HTS sub SMCC test
MagDev32025 – 2029
SMACC1 Nb3Sn short model, construction and test
REBCO Subscale 1 construction and test
REBCO Subscale 2 design, construction and test
REBCO Subscale 3 design, construction and test
SMACC2 hybrid 14 T short model design, construction and test
High background field cable test
MagMu2023 – 2027
"Switching" material selection
Material testing at cold
Simulations on chosen material use within sc magnets
Small magnet demonstrator
Report on suitability of studied materials in SC magnets
MagNum2021 – 2023
Framework architecture and Nb3Sn workflow tools
Reduced vector-potential FEM software
REBCO workflow and framework
MagRes2020 – 2024
Project start
Development experimentaltechniques
Development new epoxy systems
Mechanical characterisationand constitutive modelling
Writing thesis and report
Muon Collider Feasibility2022 – 2026
Impedance model of machine
Develop theory and model for beam dynamics and collective effects in matter
Extensive numerical simulations for the muon accelerator complex
Task 4
ns-Pulser2025 – 2028
Technology overview report
Report on generator circuits
Task 3
ns-pulse generator prototype and design report
Task 5
WireChar2019 – 2025
First annual report on the measurement campaign
Second annual report on the measurement campaign
Third annual report on the measurement campaign
Fourth annual report on the measurement campaign
Final report
WireDev2019 – 2025
Supply of experimental wires
Supply of prototype wires from the first production
Supply of improved prototype wires
Final report
No projects match those filters.